2 0 2 6

Our Most Consequential Year

To do: Leverage developments in Climate, Operations, and AI.
Without being crushed by the realities of Climate, Operations, and AI.
Read the reports
What I do

I build and scale operations where new technology meets real world constraints.

Fifteen years at the intersection of supply chain operations, technical solution design, and high-stakes B2B environments -- automation, SaaS platforms, energy transformation, and municipal infrastructure.

Go deep on discovery

Twenty-four stakeholder interviews with an energy giant before a recommendation is made.

Ecosystem mapping and technical assessment to determine what’s viable for success.

Design for messy constraints

Fire codes curtail a third of a PV array; wearable scanners endure ten-hour shifts.

Solutions built for the conditions that exist, not the ones on the diagram.

Execute across depts & orgs

CFO, engineer, utility, agency, co-op board, and the person on the floor who will live with the outcome.

Cross-functional delivery where the stakes are high and the approvals are many.

Domains

Where I’ve delivered under pressure.

Enterprise clients
bpbpJ.P. Morgan ChaseJ.P. Morgan ChaseVerizonVerizonIBMIBMYouTubeYouTubeAmerican ExpressAmerican ExpressChipotleChipotle
Agencies & employers
Publicis GroupePublicis GroupeR/GAR/GAVSA PartnersVSA PartnersPackiyoPackiyoUnderground Signs / USXLUnderground Signs / USXL
Authorities & utilities
MTAMTAMBTAMBTACTACTANYC Dept. of BuildingsNYC Dept. of BuildingsNYC DEPNYC DEPNYSERDANYSERDACon EdisonCon Edison
Live · Brooklyn, NY
27.3 kWh/day
7-day average · 5.59 kW system · 570 days operational
  
Carbon negative

Company HQ generates more power than it uses.

Ten Mississippi is a fully solar-powered operation, running beneath a 5.59 kW PV array. Installation was its own case study: structural review, ACP-5 asbestos certification, two DOB filings in the one order that actually works, Con Edison interconnection, and the §25D tax abatement.

570 days. 11.46 MWh. I live under the result.

The number above is live, not a screenshot. It is the shortest version of the argument this whole site makes.

The thesis

Complex deployments don’t fail on the technology. They fail in the seams.

Read the
Principles
all ten
The Work

The same argument, made six times, in five industries.

I

The failure is in the seams

II

The paperwork is the project

III

Coordination beats capital

Principles

Ten things I know about why projects stall.

Not values. Positions -- each one specific enough to be argued with, and each one earned somewhere on this page. Each one was learned somewhere specific, and each says where. Hover for the receipt.

  1. The seams are where it breaks.

    The technical work is scoped, budgeted, and owned. The handoffs between the parties who must approve it belong to nobody.

    bpR/GA

    Brand teams had defected to outside agencies because internal tooling wouldn’t serve them. Every workaround became a permanent piece of the estate.

  2. Everyone has to sign off.

    The CFO, the engineer, the fire code, the co-op board, the forklift operator. Miss one and the project dies quietly, months later, and nobody tells you which.

    PackiyoRabotRufus Labs

    Four approvals for one integration. The last belongs to the picker who wears it for ten hours, has no budget authority, and never gets asked.

  3. The paperwork is the project.

    Roughly 1,400 New York buildings are in Local Law 97 enforcement right now. Almost none of them for their carbon. For a form.

    NYC Dept. of Buildings

    1,400 properties in first-cycle enforcement. Almost none for exceeding a carbon cap. For failing to file a form.

  4. Sequence beats speed.

    Most delay is correct work done in the wrong order. A solar permit will not issue until the electrical permit has. Nobody is at fault and three weeks are gone.

    NYC DOBCon Edison

    The solar permit won’t issue until the electrical permit has. Treat the electrician as downstream and you’ve blocked your own filing. Nobody did anything wrong.

  5. Publish the conservative number.

    A coalition assembles around a figure it believes, not the best figure available. Optimism in a proposal is a withdrawal from an account you’ll need later.

    Big Reuse

    I published one station wagon, one driver, twenty-five tree pits, one morning. I had better numbers available.

  6. Stand inside the operation.

    Chipotle made my team work line shifts before we were allowed to design their intranet. You cannot design for work you have not done.

    ChipotleR/GA

    They made my team work line shifts before we were allowed to design their intranet. Single most useful thing a client has ever done for me.

  7. Say no to interesting complexity.

    Adaptability sounds like a feature until it becomes an invitation to build something bespoke, unscalable, and impossible to support.

    Underground SignsPackiyo

    Eleven years of custom requests against a catalogue shipping through 25 distribution partners. Later the same lesson had a better name: no science projects.

  8. Make the ask a green light.

    An ask that needs a budget line waits for a fiscal cycle. An ask that needs only permission can be answered in one meeting. Design the ask, not just the plan.

    NYC ParksCouncil District 45

    No equipment, no staff time, no budget. An agreement in principle and a short call about route and timing.

  9. Cross-vertical is not a detour.

    Warehouse robotics, a global energy company’s digital estate, a mulch route into East Flatbush. Different rooms, one problem.

    Underground SignsR/GAbpPackiyoTen Mississippi

    Fabrication and logistics, a global agency, a supermajor’s digital estate, warehouse robotics, rooftop solar. Different rooms, one problem.

  10. Show what is missing.

    Every proposal here lists what it does not have. No funding. No site control. No structural assessment. Credibility is what you admit, not what you claim.

    Ten MississippiSkidway

    No design. No team. No funding. No site control. No structural assessment. Published anyway, with the gaps listed first.

worked with -- employer, client, or delivery partner□ navigated -- agency, utility, or authority filed withhover any principle for the receipt
The flagship

Local Law 97, Plainly

What building owners actually need to know, updated for the first enforcement cycle. The penalty structure, the three deadlines, the Beneficial Electrification cliff on 1 January 2027, and why RECs are almost certainly not your backstop.

Read the whitepaper →
$268per metric ton over the cap. And a paperwork penalty that doesn’t care how clean your building is.